01.

Installation of CGU (Cogeneration)

The project included installation and commissioning of the cogeneration unit. A set of preparatory activities was carried out, including the construction of the foundation, installation of utility lines and connection to electrical and heating networks. The equipment was installed and piping was carried out, electrical and hydraulic tests were performed. Commissioning, testing of the system in various modes and optimization of parameters were carried out to achieve maximum energy efficiency.

02.

Installation of high voltage transformers

The project involved the installation of high voltage transformers. Preliminary activities included site preparation, foundation construction, and ensuring proper connection to the electrical grid. The transformers were installed, along with the necessary cabling and protection systems. After installation, electrical testing and calibration were conducted to ensure safe and efficient operation. The system was tested in various load conditions to verify its performance and reliability.

03.

Logistics services

The project encompassed a comprehensive range of logistics services, ensuring the timely and efficient delivery of materials and equipment. Key activities included transportation coordination, customs clearance, warehousing, and distribution. Advanced logistics solutions were implemented to ensure smooth handling and delivery of components, while minimizing delays. The logistics team worked closely with other departments to ensure all materials arrived on schedule and were ready for installation and assembly.

logo

Leave your request

and we will get back to you as soon as possible

I agree to the Privacy Policy